PROJECT DESCRIPTION

Ergani Dam project site is located on Sallar (Golkum ) river within the Dicle river basin within Diyarbakır province in Southeastern Anatolia region.

PROJECT DETAILS
  • Client : General Directorate of State Hydraulic Works
  • Project Name : Ergani Dam Construction
  • Contract Date : 28.03.2014
  • Completion Date as Stated on the Contract : 19.12.2016
  • Purpose : Irrigation
  • Body Type : RCC (Roller compacted concrete)
  • Body Volume : 115000 m3
  • Crest Length : 229.30 m
  • Height from foundation : 54 m
  • Reservoir volume : 13.43 x106 m3
  • Irrigation Area : 1861 ha
  • Diversion conduit : 4 m dia, 164,63 m long
COMPLETED PROJECTS