PROJECT DESCRIPTION
Ergani Dam project site is located on Sallar (Golkum ) river within the Dicle river basin within Diyarbakır province in Southeastern Anatolia region.
PROJECT DETAILS
- Client : General Directorate of State Hydraulic Works
- Project Name : Ergani Dam Construction
- Contract Date : 28.03.2014
- Completion Date as Stated on the Contract : 19.12.2016
- Purpose : Irrigation
- Body Type : RCC (Roller compacted concrete)
- Body Volume : 115000 m3
- Crest Length : 229.30 m
- Height from foundation : 54 m
- Reservoir volume : 13.43 x106 m3
- Irrigation Area : 1861 ha
- Diversion conduit : 4 m dia, 164,63 m long